I know I haven't posted anything in a couple of weeks, sorry. Busy.
This is the floorplan of the house we're planning to build. The garage is on the left, with entry from the left. The center area is a laundry room and walk-in pantry. The section on the right will be built from ICF (insulated concrete foam), which leaves us with 11 inch walls (2.5" foam on outside and inside with 6" of concrete in between).
The round things in between are two 8100 gallon rainwater collection tanks. I believe I explained the rainwater system in an earlier post but you can see more about the system at www.tanktown.com.
I had a hole dug yesterday to sample the soil and should get a foundation plan from the engineer next week. My brother's (Steve) wife's (Shea) Uncle Lonnie and I will dig out the foundation and lay rebar (I had 450 20' #4 (1/2") sticks delivered yesterday. I'll hire a crew for the pour and finish and should be ready to start setting the walls in a couple of weeks (I hope). The electric company will begin work in a couple of weeks as well.
Sorry, I don't know if you're interested in this or not so I think I'll go for a swim.... L8R.




Recent Comments